Files
fusion/scripts/lib/test-quarantine.json
gsxdsm cfc63fc8f5 FN-8724: stabilize hydration freshness tests
Make the useTasks hydration freshness coverage deterministic and restore it to the dashboard suite.

- Control the system clock for hydration fixtures and flush async updates without advancing time.
- Remove the rescued test from the dashboard exclusion list and quarantine ledger.

Files changed:
 .../__tests__/useTasks-hydration-freshness.test.ts | 30 ++++++++++++++--------
 packages/dashboard/vitest.config.ts                |  8 ------
 scripts/lib/test-quarantine.json                   |  5 ----
 3 files changed, 19 insertions(+), 24 deletions(-)

Fusion-Task-Id: FN-8724

Fusion-Task-Lineage: 1d764e2c-0975-4d26-92c6-187a6a94caee

Co-authored-by: Fusion (runfusion.ai) <noreply@runfusion.ai>
2026-08-01 20:30:16 -07:00

11 lines
1.4 KiB
JSON

{
"$comment": "Flaky-test quarantine ledger (deletion ratchet \u2014 see AGENTS.md 'Flaky tests: quarantine on sight' and docs/testing.md 'Quarantine ledger and the deletion ratchet'). A test observed failing without a corresponding real bug is quarantined ON SIGHT: add an entry here AND a matching one-line `exclude` entry in that package's vitest config, in the same commit. Every entry needs a non-empty `reason` (link the failing run) and a `quarantinedAt` date \u2014 the entry expires 14 days later, at which point the test file is DELETED unless someone rescues it with evidence it catches real regressions plus a root-cause fix (never appeasement). There is deliberately no loader module and no automation around this file: it is a dated record, the vitest config is the enforcement.",
"entries": [
{
"file": "packages/dashboard/src/__tests__/register-model-routes-kimi-k3-supplemental.test.ts",
"reason": "Real Pi SDK ModelRuntime catalog construction timed out at the 15s test budget in 2/6 sampled loaded CI runs; failing run https://github.com/Runfusion/Fusion/actions/runs/30664201149 and issue https://github.com/Runfusion/Fusion/issues/3245. FN-8647 landed a reusable shared-construction seam without widening timeouts. FN-8669 must obtain an owner budget decision and re-measure CI before the 14-day deletion deadline.",
"quarantinedAt": "2026-08-01"
}
]
}