gsxdsm 73338502e5 fix(test) + E2E: re-green main's lifecycle release leg, and prove the MERGED board + REVISE rework (#2634)
**Second batch.** Three commits, no production code. `pnpm test:gate`
green, `pnpm lint` clean, all three E2E suites together **3 files / 41
tests, exit 0**.

## 1. main's lifecycle E2E is RED right now — this fixes it

Independently of my work, on a detached `origin/main`: **2 failed / 18
passed**. Scenarios 1 and 2 fail with `sweep.released` **empty**.

**Cause:** `seedTask` relied on task creation's PROMPT.md, which is a
bootstrap seed (`"# <id>\n\n<description>"`). FN-7648's
`isUnplannedForExecution` reads that file for any card resting in an
intake- **or** hold-trait column and refuses to move an unplanned card
into a processing column. The sweep reported `held: [{ reason:
"move-rejected-or-no-slot" }]`.

**That is the gate working.** The fixture was asking the scheduler to
release a card that had never been specified. The fix is the one the
graph-entry contract doc already prescribes: *"Scheduler/release test
fixtures must model a card that cleared the gate ... A held unreviewed
card is the gate working."* `seedTask` now writes a planned PROMPT.md.

**Verified it repairs main, not just this branch:** applying only that
file to a detached `origin/main` leaves scenarios 1 and 2 **passing**,
with the 4 residual failures being scenarios 3 and 6 — which need the
fixture-options commit main does not have.

### I was wrong in #2627 and this corrects it

In #2627 I named the in-transaction capacity gate (#2488/#2499) as the
likely cause. **It was not.** Two hypotheses died, both recorded in the
code comment so nobody re-runs them:

| Hypothesis | Result |
|---|---|
| E2E settings lack `maxConcurrent` → capacity gate rejects the move |
added `maxConcurrent`/`maxWorktrees` → **still 2 failed**. Not the
cause. |
| the move itself is refused | a direct `moveTask(id, wip)` →
**succeeded**. Never the blocker. |

Only then did probing the two release gates give
`isTaskBlockedOnApproval=false`, `isUnplannedForExecution=true`, and
dumping the file show the stub. I've flagged the wrong lead on #2627 too
— a plausible-sounding cause pointed at another worker's PR is worse
than no lead.

## 2. E2E evidence: the MERGED intake+hold board

U11's shape — one column carrying intake **and** hold — had no
end-to-end coverage; every prior E2E drove intake and hold as separate
columns.

- shared fixture gains opt-in `mergedIntakeAndHold`, plus `MERGED_VOCAB`
(legacy ids, so a failure is attributable to the **role** merge alone)
and `MERGED_RENAMED_VOCAB` (ids move too).
- lifecycle scenario 3 drives the full spine: planning runs **in place**
on the dual-role column, the real `runHoldReleaseSweep` releases
**from** it, the graph runs to complete.
- 4 merge-safeguard cases on the merged board (finalize, proofless
refusal with the same reason, merged+renamed landing no legacy id,
at-most-once).

## 3. E2E evidence: a REVISE routes back through rework

The plan's `InReview → InProgress: review requests changes` had **no**
live-engine evidence on any board — the fixture's review seam always
succeeded.

Two things the engine taught me, both corrected here:
- the **IR validator refused** my rework edge: it is only legal into a
node with `config.reworkRegion: true`. A real contract, and the
validator catching it is the system working. `exec` now declares it (the
shape the builtin uses on `merge-attempt`).
- my first assertion was wrong. A REVISE does **not** leave the card in
wip — rework re-enters `exec` within the same run, review approves on
its second call, and the card finishes at complete. The evidence is the
**seam sequence**
`["planning","execute","review","execute","review","merge"]`, not an
intermediate column the run has already passed. Asserting the final
column alone would have been satisfied by a graph that ignored the
REVISE entirely.

## Both families are mutation-attributed

| Scenario | Mutation | Result |
|---|---|---|
| 3 — merged intake+hold | `isHeldTask` treats intake/hold as exclusive
| **exactly its 2 tests** fail |
| 6 — REVISE → rework | disable rework re-entry in
`workflow-graph-executor` | **exactly its 2 tests** fail |

Both fixture options are opt-in; the two pre-existing suites are
behaviourally unchanged (27 → 29 → 41 passed across the additions, no
existing assertion touched).

## Still not shipped: safeguard 2's graph E2E

Attempted twice, deleted both times. Attempt 1 passed and then survived
mutating `merge-gate` to ignore `task.autoMerge` — the card parked on
the review column's `merge-blocker` trait, not the gate. Attempt 2
removed that trait to isolate the gate, and the **control** case parked
too. Isolating it needs a merge path mirroring the builtin (`merge-gate
→ merge node → end`) rather than a direct edge to `end` — a real
redesign, not a speculative edit. The enforcement that holds today is
`allowInReviewMergeProcessing` in `project-engine` (unit-mutation
verified, NEW=9; gated via #2526).

🤖 Generated with [Claude Code](https://claude.com/claude-code)

---------

Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>