600 B
600 B
@gsxdsm/fusion
| @gsxdsm/fusion |
|---|
| patch |
Fix failed status badge persisting when moving tasks from in-progress to todo/triage
Previously, when a failed task was moved from "in-progress" back to "todo" or "triage" for retry, the status: "failed" and error fields were not cleared. This caused the dashboard to continue showing the red "failed" badge even though the task was ready for re-execution.
The moveTask function now clears status, error, worktree, and blockedBy fields when moving from "in-progress" to "todo" or "triage", consistent with the existing behavior when moving to "done".