Milestone B DagCoordinator Enqueue-Only Adapter Design

Related tasks: FN-4491, FN-4490, FN-4487, FN-4471, governance gate FN-4359.

See also: Schema migration plan · Implementation checklist · ADR v1

Governance gate

Per AGENTS.md reliability governance policy:

"Reliability mechanism changes are currently under freeze pending FN-4359 governance hardening; treat new reliability-layer behavior changes as blocked unless explicitly approved in task scope."

This design is architecture-only. Milestone B implementation requires freeze lift or explicit carve-out.

Adapter contract

ADR traceability: derived from ADR-0001 Decision (enqueue-only scheduling boundary) and Consequences #4 (no merge-path changes).

Proposed file: packages/engine/src/dag-coordinator.ts.

DagCoordinator is enqueue-only:

  • evaluates node readiness from DAG tables.
  • creates/unblocks tasks through TaskStore public APIs.
  • triggers wakeups through HeartbeatTriggerScheduler surface.

DagCoordinator MUST NOT:

  • call scheduler internals in packages/engine/src/scheduler.ts.
  • mutate AgentSemaphore directly (packages/engine/src/concurrency.ts).
  • bypass checkout leasing / 409 conflict semantics.

Proposed methods:

  • startDagRun(spec: DagRunSpec): Promise<{ runId: string }>
  • onTaskMoved(event: { taskId: string; from: string; to: string; status?: string }): Promise<void>
  • onTaskUpdated(event: { taskId: string; status?: string; column?: string }): Promise<void>
  • cancelDagRun(runId: string, reason: string): Promise<void>
  • tick(runId?: string): Promise<void> (optional bounded reconciliation pass)

Event sources

Existing observable events from current engine/task store surfaces:

  • task:created
  • task:moved
  • task:updated

Evidence in source scan:

  • packages/engine/src/scheduler.ts subscribes to task:created, task:moved, task:updated.
  • packages/engine/src/executor.ts subscribes to task:moved, task:updated.
  • packages/engine/src/project-manager.ts forwards runtime task:created, task:moved, task:updated.

No dedicated task:failed event was confirmed in existing public event vocabulary; failure detection should currently derive from task:updated status/column state.

Required engine seams (additive only)

  1. Additive coordinator wiring point in project engine bootstrap to register coordinator listeners without changing scheduler dispatch semantics.
  2. Optional narrow helper on task store/runtime event payloads for explicit terminal reason mapping (if current task:updated payload lacks enough fidelity).
  3. Feature-flag check seam (experimentalDagCoordinator) at wiring boundary so default behavior is unchanged.

All seams must be additive and behavior-preserving while FN-4359 freeze is active.

Concurrency and event-loop safety

  • Coordinator logic must be async and non-blocking.
  • No execSync in coordinator paths (aligns with AGENTS.md Engine Process Rules).
  • Any external command path (if ever needed) must use async exec/promisify(exec) with timeout.
  • Readiness evaluation should use bounded batches to avoid monopolizing the single Node event loop.

Merge-path integration (explicit invariant)

The coordinator does not change merger behavior. It does not alter:

  • post-squash audit,
  • file-scope invariant,
  • gitignored-path guard,
  • one-task-one-branch execution/merge mapping.

Failure handling map (from FN-4490 contract)

  • Per-node failure → mark dag_node.status=failed; emit dag:node:fail; evaluate run abort/continue policy.
  • Edge failure/dependency unsatisfied → keep downstream blocked/pending; emit dag:node:blocked with reason.
  • Partial-DAG abort → set run aborted; mark remaining non-terminal nodes skipped/blocked; emit dag:run:abort.
  • Whole-DAG cancel → mark run cancelled; mark non-terminal nodes cancelled; emit dag:run:abort with cancel reason.
  • Retry-exhausted → defer to existing executor retry exhaustion path (incl. FN-4398 retriesBurned semantics); coordinator records terminal node outcome, no custom retry engine.
  • Governance-blocked (e.g., FN-3973/FN-4488 policy denial) → emit dag:node:blocked with policy reason; do not retry automatically.

Observability and audit

Logger prefix: [dag-coordinator] (aligned with existing subsystem prefix style in packages/engine/src/logger.ts).

Minimum events (FN-4490 contract):

  • dag:run:start
  • dag:node:enqueue
  • dag:node:complete
  • dag:node:fail
  • dag:run:complete
  • dag:run:abort
  • additive: dag:node:blocked

Each event payload should include at least: runId, dagRunId, nodeId, taskId?, status, reasonCode?, timestamp.

Run-audit linkage:

  • database-domain audit entries for DAG row transitions.
  • git-domain unchanged (normal task flow only).
  • filesystem-domain only for normal task artifacts, not DAG-specific side channels.

Multi-project scope

ADR traceability: aligns with ADR-0001 Consequences #3 (single-project prototype scope).

Decision: per-project coordinator instance.

Rationale (from docs/multi-project.md):

  • task/state persistence is project-local in .fusion/fusion.db.
  • central DB manages registry/global coordination, not per-project task execution state.
  • one coordinator per project runtime keeps ownership boundaries consistent with existing runtime model.

Test strategy for Milestone B implementor

  1. Unit tests (packages/engine/src/__tests__/) for readiness evaluation, enqueue behavior, and event emission.
  2. Integration tests with real SQLite project DB (same init/migration path), mock heartbeat scheduler trigger points, and fixture DAG specs.
  3. Use existing executor helper conventions in packages/engine/src/__tests__/executor-test-helpers.ts when synthesizing worktree/task execution preconditions.
  4. Add/update interaction tests in packages/engine/src/__tests__/reliability-interactions/ for scheduler/executor/self-healing/restart-recovery adjacency.

Out of scope

  • Dashboard DAG UX/product surfaces (deferred to FN-4492 / Milestone C).
  • Cross-project or cross-node DAG execution.
  • Time-travel/replay engine.
  • Autoscaling/capacity orchestration redesign.

Open questions

  1. Should coordinator reconcile missed events solely via periodic tick() or rely on exhaustive event subscriptions plus startup scan?
  2. Where should DAG run initiation be invoked from (API route, workflow step hook, mission loop) for minimal coupling?
  3. What is the minimal policy reason-code taxonomy for dag:node:blocked to support diagnostics without new reliability behavior?
  4. Should node completion depend strictly on task column transitions (done) or include additional status fields for retry-exhausted terminal mapping?