Some checks failed
QA Gate (P0/P1) / Test affected app (pull_request) Has been cancelled
Surgical refresh of the drifted project index: corrected the repo path, documented the internal-admin "Supe Panel", payments now Stripe-only (EFT history preserved as deprecated), CI/CD -> qa-gate + Coolify(dev)/PM2(prod), added blog/changelog/posthog modules + Sentry entry points, route count 36 -> 42, and replaced the fictional docs list with the files that exist. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>