**Batched push, gate open.** One conversion; the two E2E commits are
held back and the reason is below — it is the more important half of
this PR body.
## Conversion
| File | triage column comparisons before | after |
|---|---|---|
| `packages/cli/src/commands/task.ts` | **1** | **0** |
`pnpm test:gate` green, `pnpm lint` clean.
All four non-terminal columns rendered the **same** glyph, so the four
id comparisons were only ever asking "is this column terminal?". Naming
`triage` made it a lifecycle-vocabulary site for no behavioural reason —
the merged Planning column dropped that id, so the comparison silently
stopped matching while the output stayed correct **by accident** (the
fallthrough gave it the same glyph).
Behaviour-identical **only** because the loop iterates the legacy
`COLUMNS` constant (`types/board.ts:27` — exactly the six ids), so `col`
can never be a custom id. Stated because the forms **diverge** outside
that set: the old chain fell through to the terminal glyph for an
unrecognised id, the new form returns the non-terminal one. If this ever
iterates workflow-resolved columns that difference becomes live, and the
right answer is a trait lookup, not this.
**Deeper bug deliberately untouched, for U12:** because the loop
iterates the legacy enum, a card in a workflow-renamed column **is not
rendered at all**. That is R8's surface change, far bigger than this
glyph.
*(Note: this file is not on the 45-guard list, so it will not move your
count. Flagging so the numbers reconcile.)*
---
## ⚠️ Live regression on origin/main — the lifecycle E2E release path
While rebasing to push, the flagship lifecycle E2E went red. **I
verified it on `origin/main` alone, with none of my commits: 2 failed /
18 passed.**
```
scenario 1 — DEFAULT vocabulary → AssertionError: expected [] to include 'FN-E2E-1'
(r.sweep.released is EMPTY)
scenario 2 — RENAMED vocabulary → audit trail differential broken:
renamed produced [{end},{review}], default produced []
```
Both are pre-existing tests I have never touched. **The capacity release
sweep is releasing nothing.**
**Likely cause, from reading rather than bisecting** — so treat it as a
lead, not a verdict: `moves.ts:1059` now resolves a capacity pool id and
enforces `enforcePooledColumnCapacity` **inside the move transaction**
(#2488 "bind the in-transaction capacity gate", made user-visible by
#2499 "make the capacity gate actually bind for real projects"). The E2E
drives with `settings = { experimentalFeatures: { workflowGraphExecutor:
true } }` — **no `maxConcurrent`** — while the fixture's wip column
declares `{ trait: "wip", config: { limitSetting: "maxConcurrent",
countPending: true } }`. If the resolved limit is finite and the pooled
count meets it, the hold→wip move is rejected on capacity and the sweep
correctly reports nothing released.
If that is right, it is a **test-harness/production interaction, not a
product break** — but it means the program's primary end-to-end evidence
for the capacity boundary is currently inert on main, which matters for
completion criterion 3. It needs the capacity worker's eyes, since
#2488/#2499 are theirs and I would be guessing at the intended
pool/limit contract.
## Why my two E2E commits are held
They add scenario 3 (merged intake+hold board) and scenario 6 (REVISE →
rework), both of which **depend on the same release leg**. On current
main they fail for main's reason, taking the file from 2 failures to 4.
Pushing them would add red to the count you are tracking and obscure
whose regression it is.
Both are complete, mutation-attributed, and green against the commit I
wrote them on:
| Scenario | Proves | Mutation that fails it |
|---|---|---|
| 3 — merged intake+hold | capacity release works from a dual-role
column | `isHeldTask` treating intake/hold as exclusive → exactly its 2
tests |
| 6 — REVISE → rework | `InReview → InProgress` on renamed *and* merged
boards | disabling rework re-entry → exactly its 2 tests |
They go out in the next batch the moment the release path is green.
## Also not shipped, twice attempted, deleted both times
Safeguard 2 (`autoMerge:false` terminal-until-human) still has **no**
graph-level E2E. Attempt 1 passed and then survived mutating
`merge-gate` to ignore `task.autoMerge` — the card was parking on the
review column's `merge-blocker` trait, not the gate. Attempt 2 removed
that trait to isolate the gate, and then the *control* case parked too,
so the flag still was not the discriminator. A fixture that can isolate
it needs a merge path mirroring the builtin (`merge-gate → merge node →
end`) rather than a direct edge to `end` — a real redesign, not a
speculative edit. The enforcement that actually holds today is
`allowInReviewMergeProcessing` in `project-engine` (unit-mutation
verified, NEW=9; gated via #2526).
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-authored-by: Claude Opus 5 (1M context) <noreply@anthropic.com>